MP Nexlevel LLC - Maple Lake, MN
Oregon CCB license #199881 - MP Nexlevel LLC - Maple Lake, Oregon. License status: Active. Valid through January 19, 2028.
Maple Lake, MN · RMI: Anthony David Sturtz · CCB since 2013 · 13 yrs
CCB Lookup Trust Score
- Active CCB license +40 pts
- 10+ years active (13 yrs) +12 pts
- Surety bond current +8 pts
- Bond above legal minimum +4 pts
- Liability insurance current +8 pts
- Insurance above legal minimum +5 pts
- Responsible Managing Individual identified +3 pts
- Phone number on record +2 pts
- Google Business Profile verified +5 pts
- Business operational on Google +3 pts
- 48 Google reviews +2 pts
-
Out-of-state contractor -3 ptsOut-of-state contractors may be less familiar with Oregon regulations and harder to reach in case of a dispute.
Power and Communication Line Construction Contractor Since 2013
MP Nexlevel LLC is a commercial general contractor based in Minnesota and licensed to work in Oregon. The company has operated since 2013 and specializes in underground utility and infrastructure work for commercial projects.
Services:
- Power and communication line installation
- Underground utility construction
- Site restoration and grading
MP Nexlevel LLC serves out-of-state projects in Oregon. The contractor maintains active CCB standing.
CCB #199881 - licensed, bonded ($80,000) and insured ($4,000,000 liability) under Oregon law.
Oregon CCB License #199881 - MP Nexlevel LLC
Oregon CCB license #199881 is currently Active - registered since May 2013 and valid through January 19, 2028.
Contact & Address
Maple Lake, MN 55358
Bond & Insurance
The bond and insurance protect you in different situations - learn what each one covers →
Surety Bond
Liability Insurance
Workers' Compensation Insurance
Source: Oregon DCBS Workers' Compensation Employer Database. Contractors not listed may be exempt as sole proprietors without employees.
Customer Reviews
My yard might not be perfect with lushes green grass, but this how MP leaves your yard after doing whatever they were running under ground, and leave their equipment trailer of plastic pipe sitting in the road and still hasn't been picked up yet a week after they finish.. do better
This contracting company digs everything up and dosent place sod over it. I will be contacting my local representatives to pitch a new law that will mandate any sort of digging company that commits 'digging' to place fresh sod. No seed, fresh local sod on top of anywhere they dig. Will…
Reading reviews, I see I'm not alone in encountering awful drivers with this company after searching the company name on the door of one of your employee vehicles. They just about ran me and my family off the road on 35W South this morning in Bloomington as they were driving all over the road…
Before You Hire
- Confirm the license is Active and hasn't expired.
- Check that bond and insurance are current - dates are listed above. Bond and insurance cover different risks →
- Confirm the RMI (Responsible Managing Individual) will be on-site.
- Always get a written contract referencing CCB license #199881.
- Cross-verify with the official CCB database - data here may have a delay.
- CCB Lookup does not include complaint or disciplinary history. For complaint records, check the official CCB search →
Verify on CCB.oregon.gov
Always confirm directly with the Oregon CCB before signing a contract. Official data is updated in real time.
Official CCB RecordQuick Summary
- Status Active
- License # #199881
- Type CGC1
- State MN
- RMI Anthony David Sturtz
- Bond $80K
- Insurance $4M
- Lic. expires January 19, 2028
- Bond expires January 19, 2028
- Ins. expires December 31, 2026
- Google rating 3.8 / 5
- Employees 11-49
- Industry POWER AND COMMUNICATION LINE AND RELATED STRUCTURES CONSTRUCTION
- Last updated July 23, 2026
- Synced September 5, 2026
Last updated = last detected change in CCB records. Synced = last fetch from the Oregon CCB Open Data Portal. Data may lag up to 24h.
Search Another Contractor
Other CGC1 - Maple Lake, MN
Verify offline
Search any Oregon CCB license by number, name or RMI — works without signal on the job site.
Are you MP Nexlevel LLC?
If any information on this profile is incorrect, here's how to fix it: CCB data (license status, bond, insurance, address) - update it directly with the Oregon CCB and CCB Lookup will sync it automatically within 24 hours. Description or other details - contact us and we'll review it within 5 business days.
Record first imported: February 22, 2026 · Last data change detected: July 23, 2026 · Synced with CCB Open Data: September 5, 2026. Always verify at CCB.oregon.gov before hiring.