Powder River Electric Inc - Baker City, Oregon
Oregon CCB license #151585 - Powder River Electric Inc - Baker City, Oregon. License status: Active. Valid through May 23, 2028.
Baker City, Baker County · RMI: Sheralee Kay Bell · CCB since 2002 · 24 yrs
CCB Lookup Trust Score
- Active CCB license +40 pts
- 10+ years active (24 yrs) +12 pts
- Surety bond current +8 pts
- Liability insurance current +8 pts
- Insurance above legal minimum +5 pts
- Responsible Managing Individual identified +3 pts
- Phone number on record +2 pts
- Google Business Profile verified +5 pts
- Business operational on Google +3 pts
- 8 Google reviews +2 pts
- 4.5★ Google rating (4.5+) +5 pts
- Oregon BCD license active (Electrical Contractor) +5 pts
- BCD license matches contractor specialty (Electrical Contractor) +3 pts
-
Website listed on Google is currently unreachable -3 ptsThe website listed on their Google Business Profile is currently unreachable. This may be temporary — the domain may have expired or the site may be under maintenance.
Licensed Electrical Contractor in Baker City, Oregon Since 2002
Powder River Electric Inc is a residential and commercial electrical contractor based in Baker City, Oregon. The company holds CSC1 and RSC licenses and has operated for over two decades, serving both homeowner and commercial clients throughout the region.
Services:
- Electrical installation and repair
- Troubleshooting and diagnostics
- Commercial electrical work
- Residential electrical services
Powder River Electric Inc serves Baker County and surrounding areas. The contractor maintains active CCB standing and is responsive to service requests across the region.
CCB #151585 - licensed, bonded ($20,000) and insured ($1,000,000) under Oregon law.
Oregon CCB License #151585 - Powder River Electric Inc
Oregon CCB license #151585 is currently Active - registered since May 2002 and valid through May 23, 2028.
Oregon BCD Licensed - Electrical
-
C Electrical Contractor · ElectricalBCD License #1-43C · Baker City, ORActive exp. Jul 2029
Data sourced from the Oregon Building Codes Division .
Contact & Address
Bond & Insurance
The bond and insurance protect you in different situations - learn what each one covers →
Surety Bond
Workers' Compensation Insurance
Source: Oregon DCBS Workers' Compensation Employer Database. Contractors not listed may be exempt as sole proprietors without employees.
Powder River Electric Inc - Customer Reviews
Based on 8 Google reviews, Powder River Electric Inc has an average rating of 4.5 out of 5. Below are 5 selected reviews from Google.
Great service! Drove an hour and a half to take care of something that's been an issue for far too long! Super fast and knows what he's doing. Highly recommend!
If you ever need a good electrician, Ron always takes care of you.Hes the best.
Reviews are provided by Google. CCB Lookup does not edit or independently verify individual customer reviews.
Before You Hire
- Confirm the license is Active and hasn't expired.
- Check that bond and insurance are current - dates are listed above. Bond and insurance cover different risks →
- Confirm the RMI (Responsible Managing Individual) will be on-site.
- Always get a written contract referencing CCB license #151585.
- Cross-verify with the official CCB database - data here may have a delay.
- CCB Lookup does not include complaint or disciplinary history. For complaint records, check the official CCB search →
CCB #151585 — Official Record
The official CCB record for Powder River Electric Inc includes complaint history, civil penalties, disciplinary actions, and administrative suspensions — updated in real time. Always verify before signing a contract.
Official CCB Record — #151585Quick Summary
- Status Active
- License # #151585
- Type RSC
- County Baker
- RMI Sheralee Kay Bell
- Bond $20K
- Insurance $1M
- Lic. expires May 23, 2028
- Bond expires May 23, 2028
- Ins. expires May 21, 2027
- Google rating 4.5 / 5
- Employees 1-10
- Industry ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS
- Last updated July 6, 2026
- Synced November 21, 2026
Last updated = last detected change in CCB records. Synced = last fetch from the Oregon CCB Open Data Portal. Data may lag up to 24h.
Search Another Contractor
Other RSC in Baker
Are you Powder River Electric Inc?
If any information on this profile is incorrect, here's how to fix it: CCB data (license status, bond, insurance, address) - update it directly with the Oregon CCB and CCB Lookup will sync it automatically within 24 hours. Description or other details - contact us and we'll review it within 5 business days.
Record first imported: February 22, 2026 · Last data change detected: July 6, 2026 · Synced with CCB Open Data: November 21, 2026. Always verify at CCB.oregon.gov before hiring.