POWER City Electric Inc - Spokane, WA
Oregon CCB license #130062 - POWER City Electric Inc - Spokane, Oregon. License status: Active. Valid through May 12, 2027.
Spokane, WA · RMI: Steven Don Gilbertz · CCB since 1999 · 27 yrs Website
CCB Lookup Trust Score
- Active CCB license +40 pts
- 10+ years active (27 yrs) +12 pts
- Surety bond current +8 pts
- Bond above legal minimum +4 pts
- Liability insurance current +8 pts
- Insurance above legal minimum +5 pts
- Responsible Managing Individual identified +3 pts
- Phone number on record +2 pts
- Google Business Profile verified +5 pts
- Business operational on Google +3 pts
- 17 Google reviews +2 pts
- Oregon BCD license active (Electrical Contractor) +5 pts
- BCD license matches contractor specialty (Electrical Contractor) +3 pts
-
PO Box address -5 ptsA contractor without a physical address is harder to locate if a dispute arises.
-
Out-of-state contractor -3 ptsOut-of-state contractors may be less familiar with Oregon regulations and harder to reach in case of a dispute.
Oregon CCB License #130062 - POWER City Electric Inc
Oregon CCB license #130062 is currently Active - registered since May 1999 and valid through May 12, 2027.
Oregon BCD Licensed - Electrical
A CCB license confirms this contractor is authorized to act as a general or specialty contractor in Oregon. A separate BCD electrical license confirms the specific technical training required to safely perform electrical work to Oregon's electrical code - a credential the CCB license alone does not verify.
One of 159 active Electrical professionals registered in Spokane County, per the Oregon BCD.
-
C Electrical Contractor · ElectricalBCD License #37-787C · Spokane, WAActive exp. Jul 2029
Data sourced from the Oregon Building Codes Division .
Bond & Insurance
The bond and insurance protect you in different situations - learn what each one covers →
Surety Bond
Liability Insurance
Oregon contractor bond and liability insurance requirements vary by license type, project scope, and risk exposure. Homeowners comparing contractors often review bond coverage limits, insurer reputation, and active policy status before signing a construction contract.
Workers' Compensation Insurance
Source: Oregon DCBS Workers' Compensation Employer Database. Contractors not listed may be exempt as sole proprietors without employees.
Contact & Address
Spokane, WA 99220-2507
POWER City Electric Inc Reviews
Based on 17 Google reviews, this contractor has an average rating of 3.6 out of 5 stars.
Truck number 328 has been reported to the sheriff's office, state patrol and SPD as of 3 p.m., on March 3rd. License plate, description of driver and video from my dashcam was given to law enforcement. Information has also been shared with the better business bureau, as well as the state…
Truck number 254 wouldn't let me merge into lane on evergreen and Sprague when the right lane ends and has to merge. The truck proceeded to speed into the center turn lane to cut me off after I merged nearly crashing both of our vehicles. I didn't cut them off last second I had my blinker…
I work in a Lamination plant and a key piece of my equipment went down. Josh from Power City rushed to our facility at the end of his day and worked late with me to diagnose the problem. The next day we were at it again early and he, in collaboration with a programmer had my machine back in running…
Before You Hire
- Confirm the license is Active and hasn't expired.
- Check that bond and insurance are current - dates are listed above. Bond and insurance cover different risks →
- Confirm the RMI (Responsible Managing Individual) will be on-site.
- Always get a written contract referencing CCB license #130062.
- Cross-verify with the official CCB database - data here may have a delay.
- CCB Lookup does not include complaint or disciplinary history. For complaint records, check the official CCB search →
Protect your home improvement project
Surety bond protection
Oregon's surety bond covers incomplete or defective work up to the bond limit. File a claim with the Oregon CCB within 2 years of project completion. How to file a bond claim →
General liability insurance
General liability covers property damage and bodily injury during the project. Ask for a COI (Certificate of Insurance) listing your address as an additional insured location.
Written contract required
Oregon law requires a written contract for residential projects over $2,000. It must include the CCB number, scope of work, and payment schedule. Contract requirements →
Workers' compensation coverage
Contractors with employees in Oregon are required to carry workers' compensation insurance. If a worker is injured on your property without coverage, you may bear liability. Verify coverage status before work begins.
Homeowners typically compare multiple licensed contractors before starting a project.
Enjoying CCB Lookup?
Share your experience on Trustpilot - it takes 30 seconds and helps other homeowners decide if this tool is right for them.
Found CCB Lookup useful as a verification tool? Share your experience on Trustpilot - not a review of the contractor you researched, but of CCB Lookup itself. It takes 30 seconds.
Leave a reviewBefore you hire
Verify this contractor carries active general liability insurance and a current surety bond. Request a Certificate of Insurance (COI) listing your property before any work begins. Oregon contractors must maintain minimum coverage - an Active license does not guarantee current insurance.
Compare contractor quotes
Before hiring, get 2–3 written estimates from licensed Oregon contractors. Compare Commercial Specialty Contractors Level 1 in Spokane to ensure competitive pricing.
Find Commercial Specialty Contractors Level 1 nearbyVerify on CCB.oregon.gov
Always confirm directly with the Oregon CCB before signing a contract. Official data is updated in real time.
Official CCB RecordRelated Guides
Official Website
www.powercityelectric.com/Quick Summary
- Status Active
- License # #130062
- Type CSC1
- State WA
- RMI Steven Don Gilbertz
- Bond $55K
- Insurance $1M
- Lic. expires May 12, 2027
- Bond expires May 12, 2027
- Ins. expires November 1, 2026
- Google rating 3.6 / 5
- Employees 1-10
- Industry ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS
- Last updated July 25, 2026
- Synced July 25, 2026
Last updated = last detected change in CCB records. Synced = last fetch from the Oregon CCB Open Data Portal. Data may lag up to 24h.
Search Another Contractor
Are you POWER City Electric Inc?
If any information on this profile is incorrect, here's how to fix it: CCB data (license status, bond, insurance, address) - update it directly with the Oregon CCB and CCB Lookup will sync it automatically within 24 hours. Description or other details - contact us and we'll review it within 5 business days.
Record first imported: February 22, 2026 · Last data change detected: July 25, 2026 · Synced with CCB Open Data: July 25, 2026. Always verify at CCB.oregon.gov before hiring.